In hydrological practice, we often need to calibrate a hydrological model. In WMO model comparison (WMO, 1982), 6 yr calibration and 4 yr verification period were adopted. More or less, it has had some effects on hydrological modelling. Are there studies about the minimum length of the data record, in other words, the informativeness of the data set?