I keen for sharing your knowledge and experience as i am working in my thesis about drawing road maps for the new shipyards to have a systemic step for having lean in its manufacture process. But here i am talking about Shiprepair or Rig Repair not the new building where the different is huge with respect of uncertainty scope and short time frame.