Hello Everyone

I have no experience in reservoir development strategy and what's acceptable and what is not

I have a new brand field with no wells and I want to put production and injection wells

The injection wells should be designed to inject alternating gas and water WAG

The reservoir is 12.5 km by 2.5 km surface area

My questions are

1) what's the allowable maximum wells of production and injection I can put in the reservoir??

2) what's the allowable maximum production and injection rate if the control mode is in reservoir volumes??

i don't know where to look for the answers

I appreciate all the suggestions and the opinions?

Best Regards

More Zainab Al-Haboobi's questions See All
Similar questions and discussions