Trying to simulate a copper alloy sand casting process at initial temperature of 1000 celcius in ProCast. The meshing looks good and there are no errors displayed. However, when it was time to simulate it, ProCast is not letting the liquid metal down the cylinder as seen in the images.
One is at t=130 seconds and the other is t= 239 seconds.