Assume suitable rates for material and labour.
i) Brick masonry work in Cement mortar (1:6)
ii) RCC (1:2:4) for roof slabs
iii) Random Rubble stone masonry in (1:3) lime sand mortar
iv) Cement Concrete floor with 1:1.5:3 proportion
v) Plastering in Cement mortar (1:4), 12mm thick for walls