Dear all,
We are working on modelling partial discharges inside solid insulation systems for evaluating the remaining lifetime of insulation system used in electrical equipment.
What do you think are the main requirements from a company for deciding to implement a system that evaluate when a maintenance action or replacement must be done in a critical equipment or component?
In the next link you can download one paper regarding our field of research, if you are interested on evaluating this kind of analysis for a company, please, let me know.
Finite-element-analysis models for numerical simulation of partial discharges in spherical cavities within solid dielectrics: a review and a novel method
https://digital-library.theiet.org/deliver/fulltext/hve/5/5/HVE.2019.0392.pdf;jsessionid=4s8c3t1g0dcg4.x-iet-live-01?itemId=/content/journals/10.1049/hve.2019.0392&mimeType=pdf&isFastTrackArticle=
Other research published:
https://scholar.google.es/citations?user=gpCF5_gAAAAJ&hl=es
Simulation and Modelling of Electrical Insulation Weaknesses in Electrical Equipment
https://www.intechopen.com/books/simulation-and-modelling-of-electrical-insulation-weaknesses-in-electrical-equipment
Best regards