SEDIMENT SIMULATED USING SWAT
CALIBRATION, ETC. SWATCUP
SUBBASIN; UNGAGAUGED, BUT MAIN BASIN HAS A GAUGE ABOUT 13
FRUSTRATING OBSERVATION ON SIMULATION: SIMULATED VALUES COMPARED TO MEASURED MISSED DATES IN SELECTED INSTANCES, E.G. IF OBSERVED SEDIMENT LOAD OF 1.3 tone per day is recorded on 12th January corresponding simulated will occur either 10 or 11th or 13 or 14th. THE VALUE WOULD BE FAIRLY CLOSER TO OBSERVED, BUT ON A DIFFERENT DAY. I ENDED UP HAVING STANDARD DEVIATIONS, MEANS FOR OBSERVED CLOSER TO EACH OTHER BUT, POOR P, R, R2 AND NS VALUE.