We are working on the incremental timetabling problem. We found a timetable that is satisfies hard constraints and optimizes soft ones. After accepting the timetable, new constraints appear.
Is there a solution that suggests minimum change to have the new table with the incremental constraints without destroying the old table in order to minimize the disturbance of the stakeholders?