Hi, we are trying to increase our lot size from 30,000 units to 72,000 units for one of our class IIb Medical device. From Quality standpoint, I am considering the change in sampling size with the same inspection level and AQL.
Do we also need a validation for increase in lot size ?
Any insights from quality are greatly appreciated.