I'd like build tracking system for under-actuated robot. The optimal reference paths has been calculated by an optimization code for path planning. My question is it necessary to linearize the system in each sample time  or I must linearize the model at one point (for example the end desired end point) and use this model  

More Ahmad Albalasie's questions See All
Similar questions and discussions