There is a crane girder of a built-up I-section with span 12 m simply supported on two brackets. After 15 years of operation of double girder overhead crane, the girder is currently deflected downwards up to 3 cm at some points while the allowable deflection is L/800 which is 1.5 cm. What is the best action for this girder?