I don't have experience with the contraction industry. However, the interface management involves the same processes , be in offshore, railway, construction, space rocket, ship building, etc.
The context of the attached paper is the subsea engineering, but method is equally applicable to any multi activity operation. The idea of DSM might be useful for you.