The production line is arranged so that the product is moved sequentially along the line and stops at work centers along the line where an operation is performed. The lean six sigma is to eliminate mistake, reduce cost and to improve efficiency by cutting unnecessary steps.

More Fatin Nadzirah Binti Abdul Latif's questions See All
Similar questions and discussions