I have the model setup with 3 nested domains with inner grid size of 700x700 with 5 km resolution. Other domains are in the multiples of 3. I have to estimate the Model processing and storage requirement for 3 days of forecast in 3 hr interval with GFS 0.5 deg data set. The other model configuration is listed below.

#Domain

Time_step = 75 sec

e_vert = 30

#Phyics

sf_ocean_physics = 0

chem_opt = 0

mp_physics = 3, WSM 3-class simple ice scheme

ra_lw_physics = 1, rrtm scheme

ra_sw_physics = 1, Dudhia scheme

radt = 50 min

sf_sfcaly_physics = 1, MM5 Monin-Obukhov scheme

sf_surface_physics = 2, Unified Noah land-surface model

sf_urban_physics = 0, activate urban canopy model

bl_pbl_physics = 1, YSU scheme

bldt = 0

cu_physics = 1, Kain-Fritsch scheme

isfflx =1

ifsnow = 0

icloud = 1

#dynamics

rk_ord = 3