Hi,

I am using questionnaire survey to draw the relationships between project risk and delay percentage in construction project based on expert opinions. The causes of delay were identified and validated. For each risk, respondents are required to specify the frequency of occurrence, degree of impact (five point scale ranging from 1 very low to 5 very high), and delay percentage if the risk occurs ( 11 point scale ranging from 0% to 100%).

My question is: how to to draw a curve representing the relationship between overall project risk and overall delay percentage?

Any suggestion

Thanks