i want know to calculate the bleeding rate for any mix design. 

1) with only cement =307 kg/m3 2) with cement and flyash =210+95 kg/m3 

Aggregate ratio FA/CA=0.6 and FA/ total Agg.=0.38

three cement having C3A8%

Is there any mix design following above parameters from which i can get good data to measure bleed rate evaluation for my project?