i want know to calculate the bleeding rate for any mix design.
1) with only cement =307 kg/m3 2) with cement and flyash =210+95 kg/m3
Aggregate ratio FA/CA=0.6 and FA/ total Agg.=0.38
three cement having C3A8%
Is there any mix design following above parameters from which i can get good data to measure bleed rate evaluation for my project?