Hot stream input:
Working fluid: air
Temp = 109.06 degrees Celsius
Pressure = 1.987 bar
mass flow rate = 353 kg/s
Cold stream input:
Working fluid: Iso-butane
Temp = 30 degrees Celsius
Pressure = 19.853 bar
mass flow rate = 59 kg/s
The goal is to obtain hot stream output temperature at 40.12 degrees Celsius and cold stream output temperature at 100 degrees Celsius!