I am trying to connect the DC load through boost converter in parallel to the grid tied PV system. The PV is connected to grid through VSI. Next to PV, i am trying to connect Boost converter. But the PV is not following the MPP for lower irradiance whereas the DC load to be supplied from both PV and grid at that instant. Somebody gimme some ideas to carry out the research further?