After the well is hydraulically fractured it could take about 5 to 10 days to clean it (drill out bridge plugs and sand using a CTU), and another 5-10 days (or more depending how quick the wellhead and linepipes are set) to connect it to the surface facilities (EPF) and open it to start producing.