In the classical reservoir engineering context, the well drainage radius is normally kept constant; while new findings indicate that it should not be kept constant; rather, the well drainage radius can be subject to change with time, depending on some operating and reservoir parameters.
I am looking for method(s) and techniques to detect and record changes in drainage radius as the well is put into production