I have a question concerning the time scale (x-axis) of Bayesian Skyline Plot (BSP) analysis as implemented in BEAST. I am not very familiar with the model underlying this analysis.
I run BSP analyses on three different dataset (one each population) for the mitochondrial COI (537bp). The first population included 97 sequences, the second population 167 sequences, and the third population 48 sequences. The programs (Beauti + BEAST + Tracer) produced 3 BSPs with different time scales: the first population, 0 to 450 Kya; second population, 0 to 1800 Kya; and third population 0 to 350 Kya. My question is “how the more ancient value of x-axis is obtained? It seems related to the number of sequences in the original dataset, does it? If so, which is the relation between the number of sequences and the length of x-axis (time) of the BSP?
Any suggestion will be greatly appreciated.
Ciao
Ferruccio