The switch must deliver the energy stored in 50kV capacitors. I would place some of them in parallel to obtain 0.5-2 Megaamps.
We could use a trigatron but I do not know if it would work well with AC current.
I could not use power mosfet or SCRs unless place them serially.
Other option is using a mechanical switch, but it would be almost impossible to switch in so short time.
We need also a trigger generator with more than 12 outputs that generates independent triggers within 1ns accuracy.