I used equivalent column method for a five story shear wall framed (dual system) and the period of model in OpenSees and etabs matched well. but when I used the method in 10 & 15 story model, the periods does not match.
if it is possible, please describe the method and about how can I link the shear wall to frame?
I would be grateful for your help.