EIA was introduced in early 1960s with the aim to analyze a proposed developmental project for its negative impacts on environment and identify suitable mitigation measures. Initially EIA was limited to developed countries. In 1970s the impact analysis concept was transferred to developed countries. Initially it was practiced in an informal manner. But later on it became a mandatory activities accross the globe through proper legislation. Initially national environmental quality standards were introduced. In this way all methods developed for impact evaluation were kept aside and NEQS were used for comparison.
In the second step Initial environmental impact analysis was introduced for small scale projects and screening exercise was removed. In the 3rd step some treatments were made mandatory for some projects and monitoring and evaluation was removed. In this manner EIA was started as one formal step at the start of a project. Now EIA is not a continues activity. It is used to get No Objection Certificate (NOC) from environmental protection department.