The life cycle stages of a building/infrastructure project can be divided into planning, design, construction, operation and end of life stages.
In practice, each stage may generally takes a certain period of time, such as 1-3 years for construction of a building project in most countries.
Are there any articles commenting on this issue? Thanks a lot.