The distribution feeder reconfiguration is usually performed for loss reduction, reliability improvement and load balancing. This will change the network connection matrix and Ybus. How the optimal locations for distributed generation connection are determined in such a network? What would be the answer of this question from distribution network operator and DG owners points of view? What philosophies do you see in practice?