So imagine modelling a viable design of a fixed-speed wind energy conversion system (WECS) for remotely located geographical areas without grid connection using Simulink. The 3-phase WECS should consist of a wound-rotor diesel synchronous generator, a wind turbine induction generator with shunt reactive power compensation, and 3-phase customer loads to be supplied at constant voltage and frequency over the entire wind speed range of [5,12] m/s. The power system to be designed should be initially operated in steady state supplying the main 50 kW load only, with an additional 50 kW load being subsequently switched on by closing the circuit breaker. so we are to analyse the system transient response to this step load change by computer simulations making the relevant conclusions/observations from the results obtained.

Similar questions and discussions