Never use linearized pseudosecond order eq. Fitting time vs time is a nonsense. The changes in q values often do not affect much the linearity of time vs time. :-) Use nonlinear fit.
The negative slope can occur if you have noisy data and the function does not start from 0 es expected in this case.