In my disclosed model it is currently producing untill the target stock (S) is reached. Instead i want to produce an Economic Production Quantity of 373 products (as seen in the variables). So when the reorderpoint (249) is reached i want to produce 373 products. The target stock is not relevant. How can i do this? Do i have to change my flowchart for this?