In order to start up a hydro unit and connect it to the grid, it needs to reach the frequency of the grid first, then can be safely connected,

I wonder, is there any way to measure, calculate or approximate the amount of water needed for synchronization? How long does it take usually?say, for a Francis turbine and generator of 250MW and 50Hz gird.

I would appreciate if you can introduce me some references on this technical subject too.,