In the Unit Commitment Problem, for a hydropower system, trying to meet the forecasted demand.
If the scheduled generation ( solution of optimization)
have variations with the demand, say 0.01 MW, is it something practical?
Will it be accepted and operated by the operators? or is it too much?
I do place tolerance because It kind of helps the solver to reach feasible and optimal solution in MINLP problem. As you know, originally it should be an equality equation.