Hello every one,
I am doing analysis of Bridge in which elastomeric bearing is modeled as link element between Deck and pier bent. Pier bent portal consist 2 pier and one cap beam on which elastomeric bearing are resting and on elastomeric bearing bridge deck is rest. I am doing non linear time history analysis.
Now (1 )due to elastomeric bearing, moment/forces are not transferred to pier hence bottom moment of pier has not reached Mp value and stresses in pier is very less (at least half of yield stress of Concrete)
(2) Joint Forces at link bottom has reached maximum level of forces and for bearing perfect elastoplastic force displacement curve has given as input of link
(3) Even if pier concrete has not reached at yield stress level CSI Bridge & SAP2000 showing hinges from IO to CP at various time steps.
Why does SAP 2000 Showing hinges in pier even if pier has not undergo plastic moment? Does it is due to yielding of Bearing