I am having a mixture of solid materials which is to be heated up and pored to make a layer of 5 inches broad and 5 mm thick. The material is allowed to cool at room temperature.

My confusion is, if I somehow change the softening point of the material, what will be the effect on the drying time? Lets say I am managed to increase the softening point from 100 to 110 deg C, will the drying time for the material will be more of less? Will it solidify fast or slow?.

More Utkarsh Maheshwari's questions See All
Similar questions and discussions