A load of 1 ton is to be transformed from one end to the other end of a building. Between the ends people are working and equipment is installed. An Overhead Crane exists in the building which has a maximum height of back at 3 meters. The load is a box of 1m x 1mx1m volume.

Indicate the method and precautions on a procedure sheet to do the task. All material and resources

required must also be indicated.

More Umar Saleem's questions See All
Similar questions and discussions