I want to include the wind power in thermal power generation scheduling problem using Weibull pdf.
I am following a research paper (see the below).
I have following doubts in the attached paper:
1) What is the difference between scheduled wind power (w_i) and available wind power (W_i,av) from the ith wind-powered generator? How can I calculate w_i and W_i,av ?
2) Is scheduled wind power is same as forecasted (or predicted) wind power?
3) How can I calculate the scheduled wind power?
Kindly enlighten your thoughts on the above mentioned points.