3 Questions 4 Answers 0 Followers
Questions related from Prateek Kumar Singhal
I want to include the wind power in thermal power generation scheduling problem using Weibull pdf. I am following a research paper (see the below). I have following doubts in the attached...
17 January 2016 1,884 5 View
How the actual wind power is calculated using wind speed and turbine data based on the Weibull probability distribution? 1) One way is to use the 1/2*rho*A*V^3*cp formula to calculate the wind...
27 December 2015 9,199 14 View
In a generation scheduling problem, the load demand has to be satisfied but in a deregulated environment, GENCOs no longer have an obligation to satisfy the load demand. So, how is the system...
16 November 2014 768 4 View