In the development of an efficient construction and demolition waste management model, the evaluation of several aspects is necessary. What aspects do you consider relevant in the development of this model?
Interesting question. I would think that the model might differentiate between waste that can be recycled and waste that cannot. Same thing for waste from nonrenewable resources and waste from renewable resources. My last thought would be the model needs to have its output developed in the context of the project type from which it is generated. Buildings typically create more waste than highways for instance.