Utilization of heat associated with the stack gas of the sponge iron plant in the process may reduce the coal consumption which is the only source of energy for this plant.
The principal cost factor in coal based process is energy cost as energy requirement for rotary kiln ranges between 14.63 and 20.9 GJ/t.The heat of waste gas is planned to be recovered by preheating the raw materials.