VCD after the end of the design to correct and generate revised versions before the start of construction, ie, a non-integrated project delivery, but with an intermediate stage between design and construction can allow the benefits of BIM stage 3?

*VDC: virtual design and construction, which when all the design are modeled and analyzed in an integrated  and optimized way.

Similar questions and discussions