Can someone please provide more insight on the mathematical formulation of a frequency constrained UC model, comprising of only synchronous sources, as well as non-synchronous sources. Also what would be the associated MILP code in GAMS?
The previous paragraph outlines a step-by-step process for using Mixed Integer Linear Programming (MILP) to solve the frequency constrained unit commitment problem in power system operation. The process involves formulating the objective function and constraints, solving the MILP problem using a suitable solver, validating the solution, and implementing the optimal unit commitment schedule in the power system operation. The main constraints include power balance, generator capacity, minimum up and down time, ramping, and frequency constraints. The solution obtained should satisfy all the constraints and be physically feasible