Logically, for the load flow analysis, bus of largest generator is considered as swing bus for reference and all other generator buses would be voltage bus. However, recently I noticed that whenever I tend to simulate power grid in ETAP to obtain the load flow solution, the generators simply go idle without any power injection to the grid unless I specify them as swing bus. The solution converges though. So, literally, I turn up specifying 8 out of 11 generator buses as swing bus which completely contradicts with my understanding of Power system.
This might be very vague explanation at this stage. However, Any insights in this matter would be of great help.