I am going to create SWAT model for modelling surface water. My study area is small river basin situated in Sri Lanka. Can I do modelling with two years of data. Nearly 15 stations cover the river basin. can I use one year as calibration period and one year as validation period? Is stream flow data collected from gauge stations also necessary as inputs for SWAT model?

Similar questions and discussions