18 December 2024 0 4K Report

In a rct, we have already decided the sample size based on one interim analysis for adaptive design; however, we are planning to add one more interim analysis for the safety, do I need to re-estimate the sample size?

Thanks!

More Xi Chen's questions See All
Similar questions and discussions