If Cp>1, the six sigma process spread fits inside the tolerance or specification limits. Then how the defects can exist? For example, if Cp=1.67 (i.e. 5 sigma level), the DPMO is 233. Does six sigma consider defect as per control limits (whereas process capability considers specification limits), rather than specification limits?