I am modelling two reinforced concrete columns with ducts in one of them and extended reinforcement in another.How do i provide a hole? in SOLID 65 concrete element so that the extended bars can be inserted from one of the column into the duct(hole) of another column in ANSYS APDL. Is they any way to change the workplane and do it and is it possible to do it after meshing as ducts are to be provided at specific locations similar to main reinforcement.Please help