What is the purpose of these models???? If it is for forecasting why dont you try with forecast within the sample and check who gives better results? If it is not just check the R squared, AIC, SIC.
On LM unit root test with structural breaks. It is possible there are different break dates. I urge you to test for two break points in the model. However, you can work with any of the break dates.