I am currently using Arena simulation software to build a model to represent discrete manufacturing for cellular layout. Through batch processing based on part type and size of two items, I would like the 1st item from part type-A batch to incur both setup and processing times on a machine (M1). However, the 2nd item from part type-A batch, must only incur processing time on M1.
Additionally, if part type-B batch is schedule and is of a different family type, the 1st item from part type-B batch must incur both setup and processing times on a machine (M1); and the 2nd item from part type-B batch must only incur processing time on M1.
Furthermore, if the part type-C batch is of the same family type, both the 1st and 2nd items from the part type-C batch should only incur processing time on M1.
Thus far, I have attempted using decide modules.
Suggestions will be appreciated.