Hi

I need to run abaqus in parallel but when the job is submitted the analysis is stoped. I have ran a similar simulation successfully via command line by increasing number of cpus from one to three on my pc but for another simulation with new umat and new input file I could not simulate the case. I will be really appreciated if someone gives some direction and guidlines for running the subroutine.

Thanks in advance.