I'm currently working on pushover analysis for multi-story structures on ETABS 17.1. The calculation time that it took was 96+ hours that too, for a building of 20 floors. I've many models to run, and some are even of 80 stories. Can someone suggest ways to reduce its calculation time for the structure?