I am trying to fit a gamma distribution for costing data, the only information that I have are mean plus interquartile range from NHS reference costs. However, in order to fit a gamma distribution, the standard error and mean are required. Does anyone know how to use the interquartile range to estimate the gamma distribution parameters that later will be used to conduct a probabilistic sensitivity analysis for economic evaluation study